9.25.2020

winter ready

It took a ridiculous amount of time and mosquito repellent, but the pump house is now winter-ready. Bill Dugan gave me thick foam insulation that I cut to fit between the studs. It had to be cut from both sides, due to my wimpy saw, which was above my pay grade. However, it is done. The electrician came out and installed wiring for an outlet and overhead light. A tiny thermostat-controlled (orange) heater is operational, and when it gets cold again, hopefully the pipes won't freeze up, and the water will keep running.

 

No comments:

Post a Comment