crise

Had to use a ruler to go over window openings today. The windows have all been ordered—it's where precisely they will go. The small upstairs windows (some fixed, all tempered glass) were placed about a foot from the floor. I got eight inches more after climbing out on my porch roof here to measure the roof trim. The downstairs windows are all going up an inch too. But the great sadness was learning that there was, after all, room for the 5'11" wide French doors. I quickly emailed the lumber company that made the window order and asked if it was too late to change the order.
YES, I'M SORRY. THOSE ARE ALL BUILT AND GETTING READY TO BE LOADED AND SHIPPED TO ARNOLD LUMBER. THEY ARE SCHEDULED TO ARRIVE THE 1ST WEEK OF MAY.
SORRY-JAY
Me too. Compromising before even breaking ground. Brother.